Work Goes On

P1000653Work Bridge

The first span of the bridge on the south shore is now gone. This section of the river will reopen as of 2400 hrs. tonight. As you can see in the pic there is a fifty foot wide gap between the pilings of the work bridge where you can float through. It is clearly marked and it should a no brainer going through.

The river is pretty much holding at 460 cfs at Maidenrock. These daily showers are very welcome.

Chubbies, mayflies and caddis still rule the top. No moths or tricos yet.

This entry was posted in General. Bookmark the permalink.

One Response to Work Goes On

  1. Pat Munday says:

    Hi Al, lost a credit card case w/ license and a few cards on a “fun” float with my visiting nephews yesterday, betw GGrant/Dewey and Silver Bridge. It was in a ziplock, probably a slight chance of being found, but just in case. Tight lines! – Pat

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>